Launch of Artemis 1 moon rocket delayed to Sept. 27 at the earliest - Space.com | Canada News Media
Connect with us

Science

Launch of Artemis 1 moon rocket delayed to Sept. 27 at the earliest – Space.com

Published

 on


NASA’s Artemis 1 moon rocket will be grounded for at least four more days.

NASA had been eyeing Sept. 23 or Sept. 27 for the launch of Artemis 1, which will use a Space Launch System (SLS) megarocket to send an Orion capsule on an uncrewed test flight to lunar orbit. But the agency announced in a blog post Monday evening (Sept. 12) that the earlier date is no longer in play; it’s now targeting Sept. 27 for the Artemis 1 liftoff, with a possible backup date of Oct. 2.

Artemis 1 was supposed to be aloft already. NASA first tried launching the mission on Aug. 29 but was stymied by an anomalous temperature reading in one of the SLS’ first-stage RS-25 engines. The mission team soon traced that issue to a faulty temperature sensor and got the SLS and Orion ready for another try on Sept. 3. But a leak of liquid hydrogen propellant scuttled that liftoff attempt as well.

Related: NASA’s Artemis 1 moon mission: Live updates
More: NASA’s Artemis 1 moon mission explained in photos

The leak occurred at a “quick disconnect,” an interface linking the SLS core stage with a propellant line coming from the rocket’s mobile launch tower. The Artemis 1 team replaced two seals around the quick disconnect last week and wrapped up other repair work related to the issue over the weekend, NASA officials wrote in the update.

NASA is now gearing up for an SLS fueling test, which will pump supercold propellant into the SLS to show that the leak has indeed been fixed. The agency had been targeting Sept. 17 for that test, but it has now been pushed back to no earlier than Sept. 21.

“The updated dates represent careful consideration of multiple logistical topics, including the additional value of having more time to prepare for the cryogenic demonstration test, and subsequently more time to prepare for the launch,” NASA officials wrote in Monday’s blog post (opens in new tab). “The dates also allow managers to ensure teams have enough rest and to replenish supplies of cryogenic propellants.”

The Artemis 1 stack remains at Pad 39B at NASA’s Kennedy Space Center in Florida, but it may end up having to roll back to KSC’s huge Vehicle Assembly Building (VAB). The U.S. Space Force, which oversees the Eastern Range for rocket launches, certified Artemis 1’s flight termination system (FTS) for just a 25-day stretch — and that time is already up.

Related stories:

NASA has requested an extension for the certification of the FTS, which is designed to destroy the Artemis 1 stack if it veers off course during liftoff. If that request is denied, the vehicle will have to be rolled off Pad 39B to the VAB, the only place where the testing required for recertification can take place. (Artemis 1 might have to go back to the VAB for repairs anyway, if the fixes made at the pad don’t end up sticking.)

“NASA is continuing to respect the Eastern Range’s process for review of the agency’s request for an extension of the current testing requirement for the flight termination system and is providing additional information and data as needed,” NASA wrote in Monday’s update. “In parallel, the agency is continuing preparations for the cryogenic demonstration test and potential launch opportunities, should the request be approved.”

NASA has already received one such FTS extension, from 20 days to 25 days.

The two upcoming liftoff dates for Artemis 1 are close to that of SpaceX’s Crew-5 astronaut mission for NASA, which is scheduled to launch toward the International Space Station from KSC’s Pad 39A on Oct. 3. 

“Teams are working the upcoming commercial crew launch in parallel to the Artemis 1 planning, and both launch schedules will continue to be assessed over the coming weeks,” NASA officials wrote in Monday’s update.

Mike Wall is the author of “Out There (opens in new tab)” (Grand Central Publishing, 2018; illustrated by Karl Tate), a book about the search for alien life. Follow him on Twitter @michaeldwall (opens in new tab). Follow us on Twitter @Spacedotcom (opens in new tab) or on Facebook (opens in new tab).  

Adblock test (Why?)



Source link

Continue Reading

Science

The body of a Ugandan Olympic athlete who was set on fire by her partner is received by family

Published

 on

 

NAIROBI, Kenya (AP) — The body of Ugandan Olympic athlete Rebecca Cheptegei — who died after being set on fire by her partner in Kenya — was received Friday by family and anti-femicide crusaders, ahead of her burial a day later.

Cheptegei’s family met with dozens of activists Friday who had marched to the Moi Teaching and Referral Hospital’s morgue in the western city of Eldoret while chanting anti-femicide slogans.

She is the fourth female athlete to have been killed by her partner in Kenya in yet another case of gender-based violence in recent years.

Viola Cheptoo, the founder of Tirop Angels – an organization that was formed in honor of athlete Agnes Tirop, who was stabbed to death in 2021, said stakeholders need to ensure this is the last death of an athlete due to gender-based violence.

“We are here to say that enough is enough, we are tired of burying our sisters due to GBV,” she said.

It was a somber mood at the morgue as athletes and family members viewed Cheptegei’s body which sustained 80% of burns after she was doused with gasoline by her partner Dickson Ndiema. Ndiema sustained 30% burns on his body and later succumbed.

Ndiema and Cheptegei were said to have quarreled over a piece of land that the athlete bought in Kenya, according to a report filed by the local chief.

Cheptegei competed in the women’s marathon at the Paris Olympics less than a month before the attack. She finished in 44th place.

Cheptegei’s father, Joseph, said that the body will make a brief stop at their home in the Endebess area before proceeding to Bukwo in eastern Uganda for a night vigil and burial on Saturday.

“We are in the final part of giving my daughter the last respect,” a visibly distraught Joseph said.

He told reporters last week that Ndiema was stalking and threatening Cheptegei and the family had informed police.

Kenya’s high rates of violence against women have prompted marches by ordinary citizens in towns and cities this year.

Four in 10 women or an estimated 41% of dating or married Kenyan women have experienced physical or sexual violence perpetrated by their current or most recent partner, according to the Kenya Demographic and Health Survey 2022.

The Canadian Press. All rights reserved.

Source link

Continue Reading

News

The ancient jar smashed by a 4-year-old is back on display at an Israeli museum after repair

Published

 on

 

TEL AVIV, Israel (AP) — A rare Bronze-Era jar accidentally smashed by a 4-year-old visiting a museum was back on display Wednesday after restoration experts were able to carefully piece the artifact back together.

Last month, a family from northern Israel was visiting the museum when their youngest son tipped over the jar, which smashed into pieces.

Alex Geller, the boy’s father, said his son — the youngest of three — is exceptionally curious, and that the moment he heard the crash, “please let that not be my child” was the first thought that raced through his head.

The jar has been on display at the Hecht Museum in Haifa for 35 years. It was one of the only containers of its size and from that period still complete when it was discovered.

The Bronze Age jar is one of many artifacts exhibited out in the open, part of the Hecht Museum’s vision of letting visitors explore history without glass barriers, said Inbal Rivlin, the director of the museum, which is associated with Haifa University in northern Israel.

It was likely used to hold wine or oil, and dates back to between 2200 and 1500 B.C.

Rivlin and the museum decided to turn the moment, which captured international attention, into a teaching moment, inviting the Geller family back for a special visit and hands-on activity to illustrate the restoration process.

Rivlin added that the incident provided a welcome distraction from the ongoing war in Gaza. “Well, he’s just a kid. So I think that somehow it touches the heart of the people in Israel and around the world,“ said Rivlin.

Roee Shafir, a restoration expert at the museum, said the repairs would be fairly simple, as the pieces were from a single, complete jar. Archaeologists often face the more daunting task of sifting through piles of shards from multiple objects and trying to piece them together.

Experts used 3D technology, hi-resolution videos, and special glue to painstakingly reconstruct the large jar.

Less than two weeks after it broke, the jar went back on display at the museum. The gluing process left small hairline cracks, and a few pieces are missing, but the jar’s impressive size remains.

The only noticeable difference in the exhibit was a new sign reading “please don’t touch.”

The Canadian Press. All rights reserved.

Source link

Continue Reading

News

B.C. sets up a panel on bear deaths, will review conservation officer training

Published

 on

 

VICTORIA – The British Columbia government is partnering with a bear welfare group to reduce the number of bears being euthanized in the province.

Nicholas Scapillati, executive director of Grizzly Bear Foundation, said Monday that it comes after months-long discussions with the province on how to protect bears, with the goal to give the animals a “better and second chance at life in the wild.”

Scapillati said what’s exciting about the project is that the government is open to working with outside experts and the public.

“So, they’ll be working through Indigenous knowledge and scientific understanding, bringing in the latest techniques and training expertise from leading experts,” he said in an interview.

B.C. government data show conservation officers destroyed 603 black bears and 23 grizzly bears in 2023, while 154 black bears were killed by officers in the first six months of this year.

Scapillati said the group will publish a report with recommendations by next spring, while an independent oversight committee will be set up to review all bear encounters with conservation officers to provide advice to the government.

Environment Minister George Heyman said in a statement that they are looking for new ways to ensure conservation officers “have the trust of the communities they serve,” and the panel will make recommendations to enhance officer training and improve policies.

Lesley Fox, with the wildlife protection group The Fur-Bearers, said they’ve been calling for such a committee for decades.

“This move demonstrates the government is listening,” said Fox. “I suspect, because of the impending election, their listening skills are potentially a little sharper than they normally are.”

Fox said the partnership came from “a place of long frustration” as provincial conservation officers kill more than 500 black bears every year on average, and the public is “no longer tolerating this kind of approach.”

“I think that the conservation officer service and the B.C. government are aware they need to change, and certainly the public has been asking for it,” said Fox.

Fox said there’s a lot of optimism about the new partnership, but, as with any government, there will likely be a lot of red tape to get through.

“I think speed is going to be important, whether or not the committee has the ability to make change and make change relatively quickly without having to study an issue to death, ” said Fox.

This report by The Canadian Press was first published Sept. 9, 2024.

The Canadian Press. All rights reserved.

Source link

Continue Reading

Trending

Exit mobile version