Connect with us

Science

New app makes figuring out CBRM solid waste collection schedule easier – CBC.ca

Published

 on



Residents of Cape Breton Regional Municipality will now have an easy way to find out what day their solid waste collection falls on.

A new app has been developed that allows residents to enter their address and find the specific day and time their garbage or recycling should be sitting at the end of their driveway.

The CBRM solid waste department had been working for months with an app developer who has made similar apps throughout North America.

Francis Campbell, the solid waste manager for CBRM, said one of the best parts of the app is the database that allows residents to search for what to do with specific waste materials.

“The search tool will educate residents in how to recycle or properly dispose of materials, and it’ll provide the curbside drop-off locations,” said Campbell.

The app sets up reminders through the calendar on a person’s phone so they will be reminded the night before to put out their garbage, recycling or green bin.

It also will be able to quickly let residents know if there is a cancellation or delay on a collection day, as well as post holiday cancellations.

CBRM deputy mayor Earlene MacMullin downloaded the app and said it was ‘fantastic.’ (CBRM)

Earlene MacMullin, the deputy mayor of CBRM, said she downloaded the app while getting the presentation on it and already found it useful.

“This is already fantastic and it seems very simplistic. I know deep down it isn’t, but in my first three minutes of using it, I encourage residents to check this out,” said MacMullin.

There will also be a web-based version along with online information regarding waste collection on the CBRM website. This will be coming when the app is fully launched in a few weeks time.

Coun. Cyril MacDonald said he is glad that people who do not have access to a smartphone can still have access to the information. 

“We’re not removing a service. You’re still able to get your calendar printed off, so I think this is great,” said MacDonald.

People who may not have access to a computer or a smartphone will still have the option to call the CBRM solid waste hotline to find out the information they need.

Mayor Amanda McDougall said she is happy she has an easy way to never forget what waste is being collected each week.

The app is now available for download through smartphone app stores.

MORE TOP STORIES

Let’s block ads! (Why?)



Source link

Continue Reading

Science

Boeing Starliner test flight postponed – FRANCE 24

Published

 on


Issued on: 02/03/2021 – 02:28Modified: 02/03/2021 – 02:26

Advertising

Washington (AFP)

An unmanned test mission of Boeing’s Starliner space capsule, which is eventually to transport astronauts to the International Space Station, has had to be postponed, NASA said Monday.

The test, which had previously been postponed until early April, will suffer another delay, this time due to unprecedented cold temperatures in Texas that caused extensive power outages in the southern US state.

“We did lose time with the weather in Houston. We lost about a week of time,” said Steve Stich, the manager of NASA’s Commercial Crew Program, during a press conference.

NASA is “continuing to evaluate options” for the new test date.

The Starliner’s first crewed flight is currently scheduled for September, Stich added.

During an initial test flight in December 2019, the Starliner capsule failed to dock at the ISS and returned to Earth prematurely — a setback for aerospace giant Boeing.

Since then, its program has fallen far behind SpaceX, the other company — owned by Tesla CEO Elon Musk — chosen by NASA to develop a vessel to transport astronauts to the ISS.

SpaceX’s Crew Dragon capsule already carried astronauts to the station in June and November 2020. Four other astronauts, including Frenchman Thomas Pesquet, will return to the ISS in April.

Let’s block ads! (Why?)



Source link

Continue Reading

Science

NASA Plans SpaceX Review, Boeing Delay Before Busy Month at ISS – BNN

Published

 on


(Bloomberg) — NASA will review an engine failure last month that caused Space Exploration Technologies Corp.’s Falcon 9 rocket booster to land in the sea after a satellite launch, as the U.S. agency prepares for the next crewed flight to the International Space Station in April.

One of the Falcon 9’s nine Merlin engines shut down Feb. 15 during ascent because of a hole in one of the covers, or “boots,” around the top of each engine, Benji Reed, SpaceX’s director of human spaceflight, said Monday at a NASA news conference. The hole allowed hot gas into the engine, which shut off as designed, Reed said. But that meant that the rocket had insufficient thrust during its landing burn to reach a drone ship stationed in the Atlantic Ocean.

The engine fault didn’t prevent the rocket from lifting SpaceX’s Starlink satellites into orbit. Reed said the boot was one of the oldest components on one of the company’s older Falcon 9 rockets, which are designed to fly as many as 10 times without major overhauls.

The National Aeronautics and Space Administration plans to “understand that anomaly” before the April flight with astronauts, Steve Stich, the agency’s commercial crew manager, told reporters as he discussed that mission and a busy April at the space station.

“We will follow along with SpaceX’s investigation and we will look at that,” Stich said.

Boeing Delay

NASA also confirmed Monday that an April 2 test flight for Boeing Co.’s Starliner will be delayed. No new date has been set, the agency said. The delay was partly due to productivity losses from the extreme cold in Texas last month and widespread loss of power in the Houston area, NASA said.

Boeing’s first test flight with astronauts is tentatively set for September, Stich said.

NASA also provided an update on several other items at the briefing:

  • SpaceX’s crewed launch scheduled for April 20 is likely to move a few days because of orbital mechanics and the space station’s positioning
  • NASA plans to relocate the SpaceX Dragon now at the station to a different node so that the crew arriving next month on another Dragon vehicle can berth in the now-occupied spot
  • NASA wants to return the astronauts from SpaceX’s Crew-1 mission, who are currently at the space station, before May 9
  • SpaceX’s next crewed flight will be with the Dragon vehicle that the company flew in May 2020 on its first test flight with astronauts
  • NASA is nearing a new arrangement with Russia’s space agency for additional seats on its Soyuz rocket, with an announcement expected this month. NASA officials said they are working to allow for Russian cosmonauts to fly aboard the Boeing and SpaceX vehicles while still using Soyuz for NASA astronauts.

©2021 Bloomberg L.P.

Let’s block ads! (Why?)



Source link

Continue Reading

Science

NASA's Perseverance rover to drill into Mars using part made on Vancouver Island – CBC.ca

Published

 on



When the Perseverance rover successfully landed on Mars last month, it arrived with a B.C.-made tool in its figurative tool belt.

The six-wheeled, plutonium-powered U.S. rover landed on the red planet on Feb. 18, with a mandate to drill down and collect tiny geological specimens that will be returned to NASA in about 2031. That drilling will be done using a drill bit tip designed and manufactured by a company based in Langford, B.C.

 “It has great wear and fraction resistance so it is perfect for a Mars application,” said Ron Sivorat, business director for Kennametal Inc., during an interview on CBC’s All Points West.

The drill bit tip is made from K92-grade tungsten carbide blanks, which Sivorat said are one of the toughest grades used for drilling here on earth and he is confident it will be good enough for Mars.

Video shows highlights of landing sequence narrated by Mission Control. 2:45

According to Sivorat, the company has had a relationship with NASA’s Jet Propulsion Laboratory since 2014, when the space agency first began ordering and testing Kennametal Inc. drill bit tips. In 2018, the company learned NASA wanted to work with it to build a bit for Perseverance.

Sivorat said staff built the drill bit to NASA’s specifications and then sent it to the agency who finessed it somewhat for its Mars mission.

When Perseverance landed safely on the fourth planet from the sun, it was an exciting moment for Kennametal Inc. employees, many of whom watched the landing online and are continuing to check on Perservance’s daily progress updates.

“We know that we are going to be part of, in one way or another, an historical event that will be remembered for many years to come,” said Sivorat.

Sivorat said he expects the drill bit built in B.C. to start penetrating the surface of Mars in the next couple of weeks.

And B.C. is not the only Canadian province with a connection to Perseverance.

Canadian Photonic Labs, based in Minnedosa, Man., manufactured a high-speed and highly-durable camera that played an instrumental role in landing the rover.

The Manitoba company’s relationship with NASA dates back roughly 15 years, he said — but much of the work that’s happened in that time has been cloaked in secrecy.

All Points West6:03From Langford B.C. to Mars: Victoria-area company supplies key component of a drill mechanism that will collect samples on the red planet

A Langford, B.C. company has supplied what could be a key to discovering if there was ever life on Mars. The business director for Kennametal Inc. talks about how the company came to provide the drill metal that will pierce the Martian surface to collect core samples. 6:03

Let’s block ads! (Why?)



Source link

Continue Reading

Trending