Stennis Space Center sets stage for Artemis testing in 2020 - Space Daily | Canada News Media
Connect with us

Science

Stennis Space Center sets stage for Artemis testing in 2020 – Space Daily

Published

 on


All eyes are on south Mississippi with this month’s delivery and installation of NASA’s Space Launch System (SLS) rocket’s first core stage to Stennis Space Center for a milestone Green Run test series prior to its Artemis I flight.

The Green Run testing will be the first top-to-bottom integrated testing of the stage’s systems prior to its maiden flight. The testing will be conducted on the B-2 Test Stand at Stennis, located near Bay St. Louis, Mississippi, and the nation’s largest rocket propulsion test site. Green Run testing will take place over several months and culminates with an eight-minute, full-duration hot fire of the stage’s four RS-25 engines to generate 2 million pounds of thrust, as during an actual launch.

“This critical test series will demonstrate the rocket’s core stage propulsion system is ready for launch on missions to deep space,” Stennis Director Rick Gilbrech said. “The countdown to this nation’s next great era of space exploration is moving ahead.”

NASA is building SLS as the world’s most-powerful rocket to return humans to deep space, to such destinations as the Moon and Mars. Through the Artemis program, NASA will send the first woman and next man to the Moon by 2024. Artemis I will be a test flight without crew of the rocket and its Orion spacecraft. Artemis II will carry astronauts into lunar orbit. Artemis III will send astronauts to the surface of the Moon.

The SLS core stage, the largest rocket stage ever built by NASA, stands 212 feet tall and measures 27.6 feet in diameter. It is equipped with state-of-the-art avionics, miles of cables, propulsion systems and propellant tanks that hold a total of 733,000 gallons of liquid oxygen and liquid hydrogen to fuel the four RS-25 engines during launch. The core stage was designed by NASA and Boeing in Huntsville, Alabama, then manufactured at NASA’s Michoud Assembly Facility in New Orleans by lead contractor Boeing, with input and contributions from more than 1,100 large and small businesses in 44 states.

“Delivering the Space Launch System rocket core stage to Stennis for testing is an epic historical milestone,” said Julie Bassler, the SLS stages manager. “My team looks forward to bringing this flight hardware to life and conducting this vital test that will demonstrate the ability to provide 2 million pounds of thrust to send the Artemis I mission to space.”

The stage was transported from Michoud to Stennis aboard the specially outfitted Pegasus barge. It arrived at the B-2 dock on Jan. 12 and was rolled out onto the test stand tarmac that night. Crews then began installing ground equipment needed for lifting the stage into a vertical position and onto the stand.

The lift was performed Jan. 21-22, which provided optimal weather and wind conditions. Crews now will fully secure the stage in place and to stand systems for testing.

NASA completed extensive modifications to prepare the B-2 stand for the test series. The stand has a notable history, having been used to test Saturn V stages that helped launch astronauts to the Moon as part of the Apollo Program and the three-engine propulsion system of the space shuttle prior to its first flight.

Preparing the stand for SLS core stage testing required upgrades of every major system on the stand, as well as the high pressure system that provides hundreds of thousands of gallons of water needed during a test. It also involved adding 1 million pounds of fabricated steel to the Main Propulsion Test Article framework that will hold the mounted core stage and extending the large derrick crane atop the stand that will be used to lift the SLS stage into place.

Once installed on the stand, operators will begin testing each of the stage’s sophisticated systems. Among other things, they will power up avionics; conduct main propulsion system and engine leak checks; and check out the hydraulics system and the thrust vector control unit that allows for rotating the engines to direct thrust and “steer” the rocket’s trajectory.

They also will conduct a simulated countdown, as well as a “wet dress rehearsal,” in which propellants are loaded and flow throughout the stage system. The rehearsal exercise will end just prior to engine ignition, with the full four-engine hot fire to come in subsequent days.

After the hot fire test, crews plan to perform refurbishment work on the stage and inspect and configure it for shipment to Kennedy Space Center. The stage will be removed from the stand, lowered to its horizontal position on the tarmac and reloaded into Pegasus for the trip to Florida.

At Kennedy, the stage will be joined with other SLS elements and prepared for launch. The next time its four RS-25 engines fire, Artemis I will be taking flight.

Related Links

Space Launch System,

Rocket Science News at Space-Travel.Com


Thanks for being there;

We need your help. The SpaceDaily news network continues to grow but revenues have never been harder to maintain.

With the rise of Ad Blockers, and Facebook – our traditional revenue sources via quality network advertising continues to decline. And unlike so many other news sites, we don’t have a paywall – with those annoying usernames and passwords.

Our news coverage takes time and effort to publish 365 days a year.

If you find our news sites informative and useful then please consider becoming a regular supporter or for now make a one off contribution.


SpaceDaily Monthly Supporter
$5+ Billed Monthly


SpaceDaily Contributor

$5 Billed Once

credit card or paypal



Russia to supply US with six RD-180 rocket engines this year

Moscow (Sputnik) Jan 23, 2020


Russian rocket engine manufacturer NPO Energomash plans to ship six RD-180 rocket engines to the United States this year, government procurement website data shows.

The RD-180 engines will be used to power the first stage of the Atlas V launch vehicles.

In December, Energomash said that it shipped a total of six RD-180 rocket engines to the United States in 2019.

In October, Roscosmos subsidiary Energomash was preparing to deliver three more RD-180 engines for use with Atlas V launch v … read more


Let’s block ads! (Why?)



Source link

Continue Reading

Science

The body of a Ugandan Olympic athlete who was set on fire by her partner is received by family

Published

 on

 

NAIROBI, Kenya (AP) — The body of Ugandan Olympic athlete Rebecca Cheptegei — who died after being set on fire by her partner in Kenya — was received Friday by family and anti-femicide crusaders, ahead of her burial a day later.

Cheptegei’s family met with dozens of activists Friday who had marched to the Moi Teaching and Referral Hospital’s morgue in the western city of Eldoret while chanting anti-femicide slogans.

She is the fourth female athlete to have been killed by her partner in Kenya in yet another case of gender-based violence in recent years.

Viola Cheptoo, the founder of Tirop Angels – an organization that was formed in honor of athlete Agnes Tirop, who was stabbed to death in 2021, said stakeholders need to ensure this is the last death of an athlete due to gender-based violence.

“We are here to say that enough is enough, we are tired of burying our sisters due to GBV,” she said.

It was a somber mood at the morgue as athletes and family members viewed Cheptegei’s body which sustained 80% of burns after she was doused with gasoline by her partner Dickson Ndiema. Ndiema sustained 30% burns on his body and later succumbed.

Ndiema and Cheptegei were said to have quarreled over a piece of land that the athlete bought in Kenya, according to a report filed by the local chief.

Cheptegei competed in the women’s marathon at the Paris Olympics less than a month before the attack. She finished in 44th place.

Cheptegei’s father, Joseph, said that the body will make a brief stop at their home in the Endebess area before proceeding to Bukwo in eastern Uganda for a night vigil and burial on Saturday.

“We are in the final part of giving my daughter the last respect,” a visibly distraught Joseph said.

He told reporters last week that Ndiema was stalking and threatening Cheptegei and the family had informed police.

Kenya’s high rates of violence against women have prompted marches by ordinary citizens in towns and cities this year.

Four in 10 women or an estimated 41% of dating or married Kenyan women have experienced physical or sexual violence perpetrated by their current or most recent partner, according to the Kenya Demographic and Health Survey 2022.

The Canadian Press. All rights reserved.

Source link

Continue Reading

News

The ancient jar smashed by a 4-year-old is back on display at an Israeli museum after repair

Published

 on

 

TEL AVIV, Israel (AP) — A rare Bronze-Era jar accidentally smashed by a 4-year-old visiting a museum was back on display Wednesday after restoration experts were able to carefully piece the artifact back together.

Last month, a family from northern Israel was visiting the museum when their youngest son tipped over the jar, which smashed into pieces.

Alex Geller, the boy’s father, said his son — the youngest of three — is exceptionally curious, and that the moment he heard the crash, “please let that not be my child” was the first thought that raced through his head.

The jar has been on display at the Hecht Museum in Haifa for 35 years. It was one of the only containers of its size and from that period still complete when it was discovered.

The Bronze Age jar is one of many artifacts exhibited out in the open, part of the Hecht Museum’s vision of letting visitors explore history without glass barriers, said Inbal Rivlin, the director of the museum, which is associated with Haifa University in northern Israel.

It was likely used to hold wine or oil, and dates back to between 2200 and 1500 B.C.

Rivlin and the museum decided to turn the moment, which captured international attention, into a teaching moment, inviting the Geller family back for a special visit and hands-on activity to illustrate the restoration process.

Rivlin added that the incident provided a welcome distraction from the ongoing war in Gaza. “Well, he’s just a kid. So I think that somehow it touches the heart of the people in Israel and around the world,“ said Rivlin.

Roee Shafir, a restoration expert at the museum, said the repairs would be fairly simple, as the pieces were from a single, complete jar. Archaeologists often face the more daunting task of sifting through piles of shards from multiple objects and trying to piece them together.

Experts used 3D technology, hi-resolution videos, and special glue to painstakingly reconstruct the large jar.

Less than two weeks after it broke, the jar went back on display at the museum. The gluing process left small hairline cracks, and a few pieces are missing, but the jar’s impressive size remains.

The only noticeable difference in the exhibit was a new sign reading “please don’t touch.”

The Canadian Press. All rights reserved.

Source link

Continue Reading

News

B.C. sets up a panel on bear deaths, will review conservation officer training

Published

 on

 

VICTORIA – The British Columbia government is partnering with a bear welfare group to reduce the number of bears being euthanized in the province.

Nicholas Scapillati, executive director of Grizzly Bear Foundation, said Monday that it comes after months-long discussions with the province on how to protect bears, with the goal to give the animals a “better and second chance at life in the wild.”

Scapillati said what’s exciting about the project is that the government is open to working with outside experts and the public.

“So, they’ll be working through Indigenous knowledge and scientific understanding, bringing in the latest techniques and training expertise from leading experts,” he said in an interview.

B.C. government data show conservation officers destroyed 603 black bears and 23 grizzly bears in 2023, while 154 black bears were killed by officers in the first six months of this year.

Scapillati said the group will publish a report with recommendations by next spring, while an independent oversight committee will be set up to review all bear encounters with conservation officers to provide advice to the government.

Environment Minister George Heyman said in a statement that they are looking for new ways to ensure conservation officers “have the trust of the communities they serve,” and the panel will make recommendations to enhance officer training and improve policies.

Lesley Fox, with the wildlife protection group The Fur-Bearers, said they’ve been calling for such a committee for decades.

“This move demonstrates the government is listening,” said Fox. “I suspect, because of the impending election, their listening skills are potentially a little sharper than they normally are.”

Fox said the partnership came from “a place of long frustration” as provincial conservation officers kill more than 500 black bears every year on average, and the public is “no longer tolerating this kind of approach.”

“I think that the conservation officer service and the B.C. government are aware they need to change, and certainly the public has been asking for it,” said Fox.

Fox said there’s a lot of optimism about the new partnership, but, as with any government, there will likely be a lot of red tape to get through.

“I think speed is going to be important, whether or not the committee has the ability to make change and make change relatively quickly without having to study an issue to death, ” said Fox.

This report by The Canadian Press was first published Sept. 9, 2024.

The Canadian Press. All rights reserved.

Source link

Continue Reading

Trending

Exit mobile version