Watch NASA's Artemis 1 SLS megarocket moon launch for free with these live webcasts - Space.com | Canada News Media
Connect with us

Science

Watch NASA's Artemis 1 SLS megarocket moon launch for free with these live webcasts – Space.com

Published

 on


NASA’s huge Artemis 1 rocket is counting down to a planned Aug. 29 launch to the moon and when it does, you’ll be able to watch the historic mission live online for free. 

The space agency will host a series of Artemis 1 webcasts this week and next leading up to the uncrewed launch on NASA’s first Space Launch System megarocket from Launch Pad 39B at the Kennedy Space Center in Florida. The briefings start on Monday, Aug. 22, and run through launch day and include special guests like actors Chris Evans, Jack Black and Keke Palmer. You can already see live views of the Artemis 1 moon rocket atop its pad in the live fe

The last time a rocket this powerful thundered off a KSC pad was back in 1973 when a Saturn V moon rocket carried Skylab into orbit, marking the end of the Apollo era, so this month’s event should be quite a show.

Related: NASA’s Artemis 1 moon mission: Live updates 

According to NASA (opens in new tab), the space agency will deliver comprehensive coverage of prelaunch, launch, and postlaunch activities for Artemis I when it comes time to light the candle. This momentous uncrewed dress rehearsal around the moon will clear the trail for a crewed moon-bound flight test with 2024’s Artemis 2, and an actual lunar landing by 2025 as part of Artemis 3.

Those lucky enough to be joining the Artemis 1 spectacle in Florida will be treated to the shock and awe of 8.8 million pounds of thrust fighting gravity and propelling the sleek SLS rocket and Orion space capsule into the heavens. For the rest of us, NASA just released its schedule for the free livestream broadcast to watch the mission  from the safety and comfort of our own homes. 

Live event coverage will air on Space.com courtesy of NASA Television, the NASA mobile app (opens in new tab), and the agency’s official website (opens in new tab), with prelaunch activities on Monday, Aug. 22. For anxious toe-tappers, the launch countdown (opens in new tab)starts Saturday, Aug. 27, at 10:23 a.m. ET.

Sure, it might not provide the same epic experience that the Earth-shuddering blastoff will offer, but it’s the next best thing and you don’t have to worry about the heat, parking hassles, or huge crowds.  

The stages of the Artemis 1 mission to the moon. (Image credit: NASA)

On launch day, a live broadcast of the festivities includes celebrity appearances by Jack Black, Chris Evans, and Keke Palmer, as well as a patriotic performance of “The Star-Spangled Banner” courtesy of Josh Groban and Herbie Hancock. Then we’ll hear “America the Beautiful” played by The Philadelphia Orchestra and cellist Yo-Yo Ma, conducted by Yannick Nézet-Séguin.

Here’s a rundown of the launch activities leading up to liftoff.

Monday, Aug. 22: Artemis 1 flight readiness review

One week from launch, on Monday, Aug. 22, NASA Artemis 1 mission managers will meet in a day-long Flight Readiness Review to decide of the Artemis 1 SLS rocket is ready for launch.

At 7 p.m. EDT (2300 GMT), NASA will hold a press conference to report on the results of that meeting and if the Artemis 1 moon rocket is still on track for its Aug. 29 liftoff. 

Here’s who will appear in that briefing.

  • Janet Petro, director, Kennedy Space Center
  • Jim Free, associate administrator for Exploration Systems Development Mission Directorate, NASA Headquarters
  • Mike Sarafin, Artemis mission manager, NASA Headquarters
  • Charlie Blackwell-Thompson, Artemis launch director, Exploration Ground Systems Program, Kennedy
  • Howard Hu, Orion Program manager, NASA’s Johnson Space Center
  • John Honeycutt, Space Launch System Program manager, NASA’s Marshall Space Flight Center

Friday, Aug. 26: NASA briefing on space industry exploration

On Friday, Aug. 26, NASA will hold a press conference at 10 a.m. EDT (1400 GMT) to highlight the role of commercial space industry on the Artemis 1 mission. 

The briefing will feature experts from NASA, Aerojet Rocketdyne, Boeing (which built the Space Launch System), Jacobs aerospace, Lockheed Martin, Northrop Grumman and Airbus. 

  • Jim Free, associate administrator, Exploration Systems Development Mission Directorate, NASA Headquarters
  • Jeff Zotti, RS-25 program director, Aerojet Rocketdyne
  • Jennifer Boland-Masterson, director of operations, Michoud Assembly Facility, Boeing
  • Randy Lycans, vice president/general manager of NASA Enterprise Solutions, Jacobs
  • Kelly DeFazio, director of Orion production, Lockheed Martin
  • Doug Hurley, senior director of business development, Northrop Grumman
  • Ralf Zimmermann, head of Moon programs and Orion European Service Module, Airbus

Saturday, Aug. 27: NASA Artemis 1 countdown begins

The Artemis 1 launch countdown will begin at 10:23 a.m. EDT (1423 GMT) on Saturday, Aug. 27. Flight controllers will be called to their stations on this day and begin the two-day countdown to the final launch target. 

Saturday, Aug. 27: NASA Artemis 1 prelaunch briefing

On Saturday, Aug. 27, NASA will hold a two briefings to discuss the Artemis 1 mission. The first will be at 11 a.m. EDT (1500 GMT), when mission managers will meet to review the launch plan for Artemis 1 as well as its mission goals. 

The briefing will include an overview of the mission, a look at the weather forecast and NASA’s backup plans in case an Aug. 29 launch date is delayed. Backup days for the mission are currently targeted for Sept. 2 and Sept. 5.

Related: NASA’s Artemis 1 moon mission explained in photos 

  • Mike Sarafin, Artemis mission manager, NASA Headquarters
  • Charlie Blackwell-Thompson, Artemis launch director, Exploration Ground Systems Program, Kennedy
  • Judd Freiling, ascent and entry flight director, Johnson
  • Rick LaBrode, lead flight director, Johnson
  • Melissa Jones, recovery director, Exploration Ground Systems Program, Kennedy 
  • Melody Lovin, weather officer, Space Launch Delta 45 
  • Jacob Bleacher, chief exploration scientist, Exploration Systems Development Mission Directorate, NASA Headquarters

Saturday, Aug. 27: NASA Artemis Moon to Mars briefing

After the prelaunch briefing, NASA will hold a press conference on Saturday, Aug. 27 at 2:30 p.m. EDT (1830 GMT), led by NASA Administrator Bill Nelson to discuss the agency’s plans to explore the moon, Mars and beyond.. 

NASA has billed the talk as a “briefing on the agency’s Moon to Mars exploration plans” and it will feature presentations by Nelson and representatives from across the agency’s exploration, space technology and spaceflight branches to outline plans to reach Mars from the moon under the Artemis program.

  • Bill Nelson, NASA administrator 
  • Bhavya Lal, NASA associate administrator for technology, policy, and strategy
  • Jim Free, NASA associate administrator, Exploration Systems Development Mission Directorate 
  • Kathy Lueders, NASA associate administrator, Space Operations Mission Directorate 
  • Thomas Zurbuchen, NASA associate administrator, Science Mission Directorate 
  • Prasun Desai, NASA deputy associate administrator, Space Technology Mission Directorate 
  • Randy Bresnik, NASA astronaut

Sunday, Aug. 28: NASA Artemis 1 countdown update

On Sunday, Aug. 28, NASA will hold a short briefing at 9 a.m. EDT (1300 GMT) to give an update on the launch progress for Artemis 1.

The briefing will review the mission’s countdown status with Jeff Spaulding, NASA’s Artemis 1 senior test director, as well as Melody Lovin, weather officer with Space Launch Delta 45 at the Cape Canaveral Space Force Station near KSC.

  • Jeff Spaulding, Artemis I senior NASA test director
  • Melody Lovin, weather officer, Space Launch Delta 45

Monday, Aug. 29: 12 a.m. EDT – Artemis 1 Launch Day – Fueling coverage

Monday, Aug. 29, is the first launch attempt for NASA’s Artemis 1 moon mission and it’s going to be a LONG day. 

NASA’s webcast activities begin at 12 a.m. EDT (0400 GMT), with a live webcast on the fueling  operations, which NASA calls tanking, of the Space Launch System. The core stage of the SLS rocket can hold about 730,000 gallons of super-cold liquid oxygen and liquid hydrogen, so loading that propellant will take hours. 

Monday, Aug. 29: 6:30 a.m. ET- Full Artemis 1 launch coverage

NASA’s full launch coverage webcast for Artemis 1 will begin on Aug. 29 at 6:30 a.m. EDT (1030 GMT). This part of the agency’s webcast will be in English. 

“Launch coverage will continue through translunar injection and spacecraft separation, setting Orion on its path to the moon,” NASA wrote in a description.

Monday, Aug. 29: 7:30 a.m. ET- Artemis 1 Spanish broadcast

At 7:30 a.m. EDT (1130 GMT), NASA’s Spanish-language webcast will begin to chronicle the Artemis 1 mission. 

The webcast will run through launch and the first 15 minutes of the mission after liftoff. Following the launch, you can get Spanish-language updates on Artemis 1 through the NASA en español social media channels.

Saturday, Aug. 29: 8:33 a.m. EDT – Artemis 1 Liftoff

This is the moment of truth for NASA’s Artemis 1 mission: the first launch window for the Space Launch System rocket. 

NASA actually has a two-hour window in which to try to launch the SLS booster, so liftoff could occur anytime between 8:33 a.m. EDT and 10:33 a.m. EDT (1233-1433 GMT), weather and technical systems permitting.

Saturday, Aug. 29: 12 p.m. ET – Artemis 1 post-launch news conference

After launch, NASA will hold a post-launch press conference scheduled for no earlier than 1 hour after the launch broadcast ends. Currently, NASA is eyeing a 12 p.m. EDT (1600 GMT) start time for this briefing, but that could change as the day progresses.

Below are the NASA officials scheduled to speak in the briefing.

  • Bill Nelson, NASA administrator 
  • Mike Sarafin, Artemis mission manager, NASA Headquarters
  • Mike Bolger, Exploration Ground Systems Program manager, Kennedy
  • Howard Hu, Orion Program manager, Johnson
  • John Honeycutt, Space Launch System Program manager, Marshall

Saturday, Aug. 29: 4 p.m. EDT – Orion trajectory burn

If all goes well with the launch, NASA will host a 4 p.m. EDT (2000 GMT) webcast to highlight the first trajectory maneuver to send the Artemis 1 Orion beyond Earth orbit and off to the moon. 

The time of this coverage may change depending on the launch time of the Artemis 1 mission. 

Saturday, Aug. 29: 5:30 p.m. EDT – Orion views of the Earth

The last major Artemis 1 launch day event is currently scheduled for 5:30 p.m. EDT (2130 GMT), when the Orion spacecraft is expected to beam its first views of the Earth from space.

Like the outbound trajectory maneuver, the timing of this broadcast is subject to change depending on the exact launch time and the health of the Orion spacecraft.

For a complete rundown of all the talks and activities surrounding Artemis 1’s thrilling flight, check out NASA’s detailed coverage schedule.

Whether staking out a sweet in-person spot to watch Artemis 1 or taking it all in via NASA’s livestream options, it’s destined to be the pyrotechnics show of the summer!

Adblock test (Why?)



Source link

Continue Reading

Science

The body of a Ugandan Olympic athlete who was set on fire by her partner is received by family

Published

 on

 

NAIROBI, Kenya (AP) — The body of Ugandan Olympic athlete Rebecca Cheptegei — who died after being set on fire by her partner in Kenya — was received Friday by family and anti-femicide crusaders, ahead of her burial a day later.

Cheptegei’s family met with dozens of activists Friday who had marched to the Moi Teaching and Referral Hospital’s morgue in the western city of Eldoret while chanting anti-femicide slogans.

She is the fourth female athlete to have been killed by her partner in Kenya in yet another case of gender-based violence in recent years.

Viola Cheptoo, the founder of Tirop Angels – an organization that was formed in honor of athlete Agnes Tirop, who was stabbed to death in 2021, said stakeholders need to ensure this is the last death of an athlete due to gender-based violence.

“We are here to say that enough is enough, we are tired of burying our sisters due to GBV,” she said.

It was a somber mood at the morgue as athletes and family members viewed Cheptegei’s body which sustained 80% of burns after she was doused with gasoline by her partner Dickson Ndiema. Ndiema sustained 30% burns on his body and later succumbed.

Ndiema and Cheptegei were said to have quarreled over a piece of land that the athlete bought in Kenya, according to a report filed by the local chief.

Cheptegei competed in the women’s marathon at the Paris Olympics less than a month before the attack. She finished in 44th place.

Cheptegei’s father, Joseph, said that the body will make a brief stop at their home in the Endebess area before proceeding to Bukwo in eastern Uganda for a night vigil and burial on Saturday.

“We are in the final part of giving my daughter the last respect,” a visibly distraught Joseph said.

He told reporters last week that Ndiema was stalking and threatening Cheptegei and the family had informed police.

Kenya’s high rates of violence against women have prompted marches by ordinary citizens in towns and cities this year.

Four in 10 women or an estimated 41% of dating or married Kenyan women have experienced physical or sexual violence perpetrated by their current or most recent partner, according to the Kenya Demographic and Health Survey 2022.

The Canadian Press. All rights reserved.

Source link

Continue Reading

News

The ancient jar smashed by a 4-year-old is back on display at an Israeli museum after repair

Published

 on

 

TEL AVIV, Israel (AP) — A rare Bronze-Era jar accidentally smashed by a 4-year-old visiting a museum was back on display Wednesday after restoration experts were able to carefully piece the artifact back together.

Last month, a family from northern Israel was visiting the museum when their youngest son tipped over the jar, which smashed into pieces.

Alex Geller, the boy’s father, said his son — the youngest of three — is exceptionally curious, and that the moment he heard the crash, “please let that not be my child” was the first thought that raced through his head.

The jar has been on display at the Hecht Museum in Haifa for 35 years. It was one of the only containers of its size and from that period still complete when it was discovered.

The Bronze Age jar is one of many artifacts exhibited out in the open, part of the Hecht Museum’s vision of letting visitors explore history without glass barriers, said Inbal Rivlin, the director of the museum, which is associated with Haifa University in northern Israel.

It was likely used to hold wine or oil, and dates back to between 2200 and 1500 B.C.

Rivlin and the museum decided to turn the moment, which captured international attention, into a teaching moment, inviting the Geller family back for a special visit and hands-on activity to illustrate the restoration process.

Rivlin added that the incident provided a welcome distraction from the ongoing war in Gaza. “Well, he’s just a kid. So I think that somehow it touches the heart of the people in Israel and around the world,“ said Rivlin.

Roee Shafir, a restoration expert at the museum, said the repairs would be fairly simple, as the pieces were from a single, complete jar. Archaeologists often face the more daunting task of sifting through piles of shards from multiple objects and trying to piece them together.

Experts used 3D technology, hi-resolution videos, and special glue to painstakingly reconstruct the large jar.

Less than two weeks after it broke, the jar went back on display at the museum. The gluing process left small hairline cracks, and a few pieces are missing, but the jar’s impressive size remains.

The only noticeable difference in the exhibit was a new sign reading “please don’t touch.”

The Canadian Press. All rights reserved.

Source link

Continue Reading

News

B.C. sets up a panel on bear deaths, will review conservation officer training

Published

 on

 

VICTORIA – The British Columbia government is partnering with a bear welfare group to reduce the number of bears being euthanized in the province.

Nicholas Scapillati, executive director of Grizzly Bear Foundation, said Monday that it comes after months-long discussions with the province on how to protect bears, with the goal to give the animals a “better and second chance at life in the wild.”

Scapillati said what’s exciting about the project is that the government is open to working with outside experts and the public.

“So, they’ll be working through Indigenous knowledge and scientific understanding, bringing in the latest techniques and training expertise from leading experts,” he said in an interview.

B.C. government data show conservation officers destroyed 603 black bears and 23 grizzly bears in 2023, while 154 black bears were killed by officers in the first six months of this year.

Scapillati said the group will publish a report with recommendations by next spring, while an independent oversight committee will be set up to review all bear encounters with conservation officers to provide advice to the government.

Environment Minister George Heyman said in a statement that they are looking for new ways to ensure conservation officers “have the trust of the communities they serve,” and the panel will make recommendations to enhance officer training and improve policies.

Lesley Fox, with the wildlife protection group The Fur-Bearers, said they’ve been calling for such a committee for decades.

“This move demonstrates the government is listening,” said Fox. “I suspect, because of the impending election, their listening skills are potentially a little sharper than they normally are.”

Fox said the partnership came from “a place of long frustration” as provincial conservation officers kill more than 500 black bears every year on average, and the public is “no longer tolerating this kind of approach.”

“I think that the conservation officer service and the B.C. government are aware they need to change, and certainly the public has been asking for it,” said Fox.

Fox said there’s a lot of optimism about the new partnership, but, as with any government, there will likely be a lot of red tape to get through.

“I think speed is going to be important, whether or not the committee has the ability to make change and make change relatively quickly without having to study an issue to death, ” said Fox.

This report by The Canadian Press was first published Sept. 9, 2024.

The Canadian Press. All rights reserved.

Source link

Continue Reading

Trending

Exit mobile version