Quebec City’s àVélo bike-share service logged a record 2,433,400 trips in its 2026 season, up 23 per cent from 2025, the Réseau de transport de la Capitale (RTC) said in a Nov. 16 release.
The season ran from April 15 to Nov. 15, the longest yet at seven months, and averaged about 11,300 trips a day. The busiest day was July 15, during the Festival d’été de Québec, with 19,770 trips. The network had 2,300 bikes and 225 stations, and the most used stations were at Cartier and Fraser, Place d’Youville and Place Jacques-Cartier.
Much of the traffic was near tramway construction. The RTC counted 1,702,956 trips in the area affected by the work, up 19 per cent. That area had 131 of the stations.
Our calculation shows ridership grew faster away from the construction. Subtracting those trips leaves about 730,000 elsewhere on the network, an increase of roughly 30 to 37 per cent from 2025. The result is a range because the RTC published its growth rates as rounded percentages and the release does not give last year’s totals. The season also averaged about 1,060 trips for each bike in the fleet.
“It goes without saying that people have shown up, with a 23 per cent increase in the number of trips over last year,” RTC president Yannick Fauteux said in French in the release. He said the added stations helped people get through the major work sites.
The RTC estimates the service avoided 730,000 car trips. In an online survey of 3,709 subscribers from Oct. 23 to 30, 67 per cent of those surveyed said they used àVélo every week, 45 per cent named work as their main reason for riding and 76 per cent said they own a car. Overall satisfaction was 98 per cent.
About 44,000 different people used the service, Monquartier reported. Michel de Mauraige, general manager of Capitale Mobilité, told the outlet that the 2025 results had been somewhat inflated by an RTC strike that pushed some riders toward the bikes, and that àVélo still beat them by 23 per cent.
àVélo is due back next spring for a seventh season, with expansion into Duberger-Les Saules, Vieux-Moulin and Vieux-Bourg.
The tramway behind much of this year’s construction remains politically contested, as Mayor Bruno Marchand and Conservative Leader Éric Duhaime showed in October. The city’s $276-million tally of climate plan investments leaves out both the tramway and àVélo.
Sources: Réseau de transport de la Capitale (in French) and Monquartier (in French).
If you find reporting like this useful, consider supporting Canada News Media, an independently owned Canadian newsroom.
Follow Canada News Media
Get the day's top Canadian stories and our two daily 60-second news videos wherever you scroll.
X Threads Facebook Instagram LinkedIn TikTok YouTube Pinterest Reddit Substack Flipboard Newsletter RSS













